Friday, February 15, 2013

Adventure #174

The second stage in our bathroom remodel was to take up the old linoleum and put in a new floor. Here is a good before picture.
So what did we have to do? We pulled out the baseboards, removed the toilet, tore out the linoleum along with the sub floor, put in a new sub floor, prepared the sub floor, put in new linoleum, and grouted the linoleum. Yeah! A new clean floor.

No comments:

Post a Comment